Aesthetics Occupational Health & Safety Discussion
Description
Instructions
Acme General Contractors, Inc. is the general contractor for the construction of a multi-story apartment building that is approximately 40% complete. They received an OSHA citation for not having an emergency action plan (EAP). You have been hired as the company safety officer to develop and implement the program required by OSHA.
The apartment building will be 14 stories tall with 250 total apartments. The construction is concrete masonry units (CMU) block exterior walls and a metal roof. The company has seven sub-contractors performing typical work such as electrical, heating and air, and other services Aesthetics Occupational Health & Safety Discussion.
ORDER YOUR PAPER HERE
Prepare a written EAP containing all the information required by 29 C.F.R. 1926.35. Your plan must address how you will specifically address the requirement for medical services and first aid, means of egress and notification of emergency, and employee training. Additionally, include a section that addresses how you will reduce the risk of and respond to acts of violence at the worksite.
please include this book Goetsch, D. L. (2018). Construction safety and the OSHA standards (2nd ed.).
Your plan must be at least four pages in length, not counting your title page and reference page. You must include at least three academic references. Adhere to APA Style when creating citations and references for this assignment. APA formatting, however, is not necessary Aesthetics Occupational Health & Safety Discussion